Service scope
Engineering, installation and operation of early production facilities (DCO), heavy crude oil pumping centers and water injection systems for secondary recovery. Scope and deliverables are defined according to asset conditions, available information and the project's technical requirements.
What you receiveEngineering and facilities for pumping, separation or injection, according to the project scope.
Technical data sheet and parameters
- Pumping capacity
- Up to 48,000 bbl/d with a redundant 2N+1 configuration
- Water injection (EOR)
- Up to 40,000 bbl/d at pressures from 900 to 1,900 psi
- Modular facilities
- Skid-mounted two-phase/three-phase separation
- Reference standards
- API Spec 6D, API 11P, ASME B31.3 / B31.4
Specialties and field deliverables
- DCO pumping centers: High-pressure positive displacement and centrifugal equipment with automatic backup.
- EOR injection: Modular formation water treatment and filtration plants for reservoir pressurization.
- Early production facilities: Commissioning of facilities for isolated wells; the transport configuration is defined according to project conditions.
Basins and fields for operational deployment
Production well pads in the Carabobo and Junín Blocks (Orinoco Belt), mature fields in Zulia and the Eastern District.