Production infrastructure and EOR

Production facilities and systems aligned with each field's conditions.

Production infrastructure and EOR

Service scope

Engineering, installation and operation of early production facilities (DCO), heavy crude oil pumping centers and water injection systems for secondary recovery. Scope and deliverables are defined according to asset conditions, available information and the project's technical requirements.

What you receiveEngineering and facilities for pumping, separation or injection, according to the project scope.

Technical data sheet and parameters

Pumping capacity
Up to 48,000 bbl/d with a redundant 2N+1 configuration
Water injection (EOR)
Up to 40,000 bbl/d at pressures from 900 to 1,900 psi
Modular facilities
Skid-mounted two-phase/three-phase separation
Reference standards
API Spec 6D, API 11P, ASME B31.3 / B31.4

Specialties and field deliverables

  • DCO pumping centers: High-pressure positive displacement and centrifugal equipment with automatic backup.
  • EOR injection: Modular formation water treatment and filtration plants for reservoir pressurization.
  • Early production facilities: Commissioning of facilities for isolated wells; the transport configuration is defined according to project conditions.

Basins and fields for operational deployment

Production well pads in the Carabobo and Junín Blocks (Orinoco Belt), mature fields in Zulia and the Eastern District.

The working environment in pictures

Exterior view of process facilities and industrial equipment.
Process facilities
A person wearing a hard hat and holding documentation beside pipes at an industrial facility.
Facility inspection
A person wearing a hard hat and holding documentation in a corridor of pipes and tanks.
Surface piping review